Our contribution to environmental protection
PVC recycling
Up to 95% re-use of raw materials accrued during the production process.
Water treatment pickling plant
Water treatment pickling plant including up to 100 % heat recovery
Energy generation
Production hall plastics:
500 m deep drilling ( for heating) 3 x approx. 300 meters horizontal drilling (waster heat storage/heating/cooling)
Production hall steel:
10 horizontal drillings (for heating)
Dispatch hall:
4 x energy baskets for heating of office rooms and cooling of photovoltaic plant
Geothermal energy based research
Research projects:
3 x 150 m geothermal probe drillings for asphalt tempering. Storage hall/truck access 3 x 150 m geothermal probe drillings for asphalt tempering. Car park